Our Projects

RELEVANT EXPERIENCES

FEATURED PROJECTS

Geotechnical Investigations for Output and Performance Based Road Contract(OPRC) Lot 1 Tororo-Mbale-Soroti-Weigh Bridge

Geotechnical Investigations Report for 4 Storeyed Hostel in Nyamitanga

Geotechnical Investigations for the design of Aqua Feed, Full Fat Soya And Concentrate Plant Greenfield

Geotechnical investigations for the structural designs of Bihanga catholic parish church in Buhweju district

Structural Integrity assessment of 2 stored residential building in Naguru

Structural integrity assessment for hardware building along Ntinda - Kisaasi road

Geotechnical investigations for engineering design of a hardware building in Nyamitanga- Pecamega

Structural Integrity Assessment - Kira

OTHER PROJECTS

# Project Name Services Provided
1 Materials testing and quality control and assurance for the construction of Yosia – Bazitye road in Wakiso
  • - Field tests i.e. field density test by sand replacement
  • - Carrying out laboratory tests on construction materials namely; PSD, Atterberg limits, Compaction CBR test, modification and testing
  • - Data Entry and Result Analysis
  • - Preparation of a Final Soils and Materials Investigations Report
2 Materials testing for the refurbishment of the Uganda railway from Kampala to Mukono
  • - Materials testing on fine aggregates, course aggregates cement, ballast, water, Soils i.e. Granulometry materials passing and retained on 63microns, slab index, corm co-efficient, alkali reactive tests, Soft particles, Sulphur compounds, Chlorides, Form coefficient, Acid-soluble sulphates ,Water absorption, Bulk density, Slab index etc.
  • - Field tests i.e. Nuclear gauge test, field density test by sand replacement
  • - Data Entry and Result Analysis
  • - Preparation of a Final Soils and Materials Investigations Report
3 Quality control for the construction of the sleeper factory in Lugazi
  • - Field tests i.e. Nuclear gauge test, field density test by sand replacement
  • - Carrying out laboratory tests namely; PSD, Hydrometer test, Atterberg limits, Compaction CBR test, Consolidation Tests
  • - Data Entry and Result Analysis
  • - Preparation of a Final Soils and Materials Investigations Report
4 Geotechnical investigations for the construction for the design and construction of a retaining wall at DFCU in Namanve
  • - Performing field moisture tests using speedy moisture tester
  • - Conducting DCP tests near each excavated test pit
  • - Carrying out laboratory tests namely; PSD, Hydrometer test, Atterberg limits, Compaction CBR test, Shear Test and Consolidation Tests
  • - Data Entry and Result Analysis
  • - Preparation of a Final Soils and Materials Investigations Report
5 Materials testing for the design of community access roads and accommodation houses in Tilenga – Bugonga site
  • - Field tests i.e. field density test by sand replacement
  • - Carrying out laboratory tests on construction materials namely; PSD, Atterberg limits, Compaction CBR test, modification and testing
  • - Data Entry and Result Analysis
  • - Preparation of a Final Soils and Materials Investigations Report
6 Geotechnical investigations and materials testing for the design and construction of 2 storeyed residential house in Lubowa
  • - Field tests i.e. field density test by sand replacement
  • - Carrying out laboratory tests on construction materials namely; PSD, Atterberg limits, Compaction CBR test, modification and testing
  • - Data Entry and Result Analysis
  • - Preparation of a Final Soils and Materials Investigations Report
7 Geotechnical Investigations Report for The Proposed 4 storied commercial building at Kakyenkye, Kyamugorani, Mbarara
  • - Trial pits exploration to a depth of 2m, logging each trial pit, sampling and recording
  • - Hand auguring
  • - Conducting DCP tests near each excavated test pit
  • - Carrying out laboratory tests namely; PSD, Hydrometer test, Atterberg limits, Sulphate content, chloride content, PH, Compaction, CBR test, Shear Test and Consolidation Tests
  • - Data Entry and Result Analysis
  • - Preparation of a Final Soils and Materials Investigations Report
8 Quality Control at CBL Kakungulu Reinforced Concrete Roads
  • - Concrete Mix Design
  • - Material Testing
  • - Field tests i.e. field density test by sand replacement
  • - Carrying out laboratory tests on construction materials namely; PSD, Atterberg limits, Compaction CBR test, modification and testing
  • - Data Entry and Result Analysis
  • - Compressive Strength Tests
9 Geotechnical Investigations for Proposed Two (2) Storied Commercial Building, Kigo-Wakiso District
  • - Trial pits exploration to a depth of 1m, logging each trial pit, sampling and recording
  • - Hand auguring
  • - Conducting DCP tests near each excavated test pit
  • - Carrying out laboratory tests namely; PSD, Hydrometer test, Atterberg limits, Compaction CBR test, Shear Test and Consolidation Tests
  • - Data Entry and Result Analysis
  • - Preparation of a Final Soils and Materials Investigations Report
10 Geotechnical Investigations and Material Testing for Mbarara Archidiocese Cathedral
  • - Trial pits exploration to a depth of 2m, logging each trial pit, sampling and recording
  • - Hand auguring
  • - Conducting DPL tests near each excavated test pit
  • - Carrying out laboratory tests namely; PSD, Hydrometer test, Atterberg limits, Compaction CBR test, Shear Test and Consolidation Tests
  • - Data Entry and Result Analysis
  • - Preparation of a Final Soils and Materials Investigations Report
11 Structural Integrity Assessment Report for an Existing Mixed Development in Najjera
  • - Trial pits exploration to a depth of 2m outside and exposing the column pads, logging each trial pit
  • - Concrete strength assessment using rebound Hammer
  • - Conducting DCP tests near each excavated test pit
  • - Reinforcement Identification in the structural Elements
  • - Assessing the dimensions of the structural Elements
  • - Carrying out laboratory tests namely; PSD, Hydrometer test, Atterberg limits, Compaction
  • - Data Entry and Result Analysis
  • - Preparation of a Final Soils and Materials Investigations Report
12 Geotechnical Investigations Report for Proposed Four Storied Residential Building at Plot 743, Block 183 Kyadondo
  • - Trial pits exploration to a depth of 2m, logging each trial pit, sampling and recording
  • - Hand auguring
  • - Conducting DCP tests near each excavated test pit
  • - Carrying out laboratory tests namely; PSD, Hydrometer test, Atterberg limits, Sulphate content, chloride content, PH, Compaction, CBR test, Shear Test and Consolidation Tests
  • - Data Entry and Result Analysis
  • - Preparation of a Final Soils and Materials Investigations Report
13 Geotechnical Investigations Report for proposed Ian residential Project at Kyadondo
  • - Trial pits exploration to a depth of 2m, logging each trial pit, sampling and recording
  • - Hand auguring
  • - Conducting DCP tests near each excavated test pit
  • - Carrying out laboratory tests namely; PSD, Hydrometer test, Atterberg limits, Sulphate content, chloride content, PH, Compaction, CBR test, Shear Test and Consolidation Tests
  • - Data Entry and Result Analysis
  • - Preparation of a Final Soils and Materials Investigations Report
14 Geotechnical investigations for the construction of 3 storeyed condominium apartments in Kisugu
  • - Trial pits exploration each to a depth of 4m, logging each trial pit, sampling and recording
  • - Conducting DCP tests near each excavated test pit
  • - Carrying out laboratory tests namely; PSD, Hydrometer test, Atterberg limits, Compaction CBR test, Dispersivity Tests, Shear Test etc
  • - Data Entry and Result Analysis
  • - Preparation of a Final Soils and Materials Investigations Report
15 Geotechnical Investigations Report for The Proposed Residential House at Kitikifumba, Bulindo
  • - Trial pits exploration to a depth of 2m, logging each trial pit, sampling and recording
  • - Hand auguring
  • - Conducting DCP tests near each excavated test pit
  • - Carrying out laboratory tests namely; PSD, Hydrometer test, Atterberg limits, Sulphate content, chloride content, PH, Compaction, CBR test, Shear Test and Consolidation Tests
  • - Data Entry and Result Analysis
  • - Preparation of a Final Soils and Materials Investigations Report
16 Geotechnical Investigations Report for The Proposed Hotel at Nyakayojo, Mbarara
  • - Trial pits exploration to a depth of 2m, logging each trial pit, sampling and recording
  • - Hand auguring
  • - Conducting DCP tests near each excavated test pit
  • - Carrying out laboratory tests namely; PSD, Hydrometer test, Atterberg limits, Sulphate content, chloride content, PH, Compaction, CBR test, Shear Test and Consolidation Tests
  • - Data Entry and Result Analysis
  • - Preparation of a Final Soils and Materials Investigations Report
17 Geotechnical investigations for a three storeyed residential apartments in Kitikifumba- Namugongo
  • - Trial pits exploration to a depth of 2m, logging each trial pit, sampling and recording
  • - Conducting DCP tests near each excavated test pit
  • - Carrying out laboratory tests namely; PSD, Hydrometer test, Atterberg limits, Compaction CBR test, Shear Tests
  • - Data Entry and Result Analysis
  • - Preparation of a Final Soils and Materials Investigations Report
18 Geotechnical investigations for the structural designs of a swimming pool in Lufumbe - Nakisunga subcounty, Mukono district
  • - Trial pits exploration to a depth of 2m, logging each trial pit, sampling and recording
  • - Conducting DCP tests near each excavated test pit
  • - Carrying out laboratory tests namely; PSD, Atterberg limits, Compaction CBR test
  • - Data Entry and Result Analysis
  • - Preparation of a Final Soils and Materials Investigations Report
19 Geotechnical investigations for a 3 storeyed dormitory building in Rwebikoona at St. Marys girls school
  • - Trial pits exploration to a depth of 2m, logging each trial pit, sampling and recording
  • - Hand auguring
  • - Conducting DCP tests near each excavated test pit
  • - Carrying out laboratory tests namely; PSD, Hydrometer test, Atterberg limits, Compaction CBR test, Permeability, Shear Test and Consolidation Tests.
  • - Data Entry and Result Analysis
  • - Preparation of a Final Soils and Materials Investigations Report