1 |
Materials testing and quality control and assurance for the construction of Yosia – Bazitye road in Wakiso |
- - Field tests i.e. field density test by sand replacement
- - Carrying out laboratory tests on construction materials namely; PSD, Atterberg limits, Compaction CBR test, modification and testing
- - Data Entry and Result Analysis
- - Preparation of a Final Soils and Materials Investigations Report
|
2 |
Materials testing for the refurbishment of the Uganda railway from Kampala to Mukono |
- - Materials testing on fine aggregates, course aggregates cement, ballast, water, Soils i.e. Granulometry materials passing and retained on 63microns, slab index, corm co-efficient, alkali reactive tests, Soft particles, Sulphur compounds, Chlorides, Form coefficient, Acid-soluble sulphates ,Water absorption, Bulk density, Slab index etc.
- - Field tests i.e. Nuclear gauge test, field density test by sand replacement
- - Data Entry and Result Analysis
- - Preparation of a Final Soils and Materials Investigations Report
|
3 |
Quality control for the construction of the sleeper factory in Lugazi |
- - Field tests i.e. Nuclear gauge test, field density test by sand replacement
- - Carrying out laboratory tests namely; PSD, Hydrometer test, Atterberg limits, Compaction CBR test, Consolidation Tests
- - Data Entry and Result Analysis
- - Preparation of a Final Soils and Materials Investigations Report
|
4 |
Geotechnical investigations for the construction for the design and construction of a retaining wall at DFCU in Namanve |
- - Performing field moisture tests using speedy moisture tester
- - Conducting DCP tests near each excavated test pit
- - Carrying out laboratory tests namely; PSD, Hydrometer test, Atterberg limits, Compaction CBR test, Shear Test and Consolidation Tests
- - Data Entry and Result Analysis
- - Preparation of a Final Soils and Materials Investigations Report
|
5 |
Materials testing for the design of community access roads and accommodation houses in Tilenga – Bugonga site |
- - Field tests i.e. field density test by sand replacement
- - Carrying out laboratory tests on construction materials namely; PSD, Atterberg limits, Compaction CBR test, modification and testing
- - Data Entry and Result Analysis
- - Preparation of a Final Soils and Materials Investigations Report
|
6 |
Geotechnical investigations and materials testing for the design and construction of 2 storeyed residential house in Lubowa |
- - Field tests i.e. field density test by sand replacement
- - Carrying out laboratory tests on construction materials namely; PSD, Atterberg limits, Compaction CBR test, modification and testing
- - Data Entry and Result Analysis
- - Preparation of a Final Soils and Materials Investigations Report
|
7 |
Geotechnical Investigations Report for The Proposed 4 storied commercial building at Kakyenkye, Kyamugorani, Mbarara |
- - Trial pits exploration to a depth of 2m, logging each trial pit, sampling and recording
- - Hand auguring
- - Conducting DCP tests near each excavated test pit
- - Carrying out laboratory tests namely; PSD, Hydrometer test, Atterberg limits, Sulphate content, chloride content, PH, Compaction, CBR test, Shear Test and Consolidation Tests
- - Data Entry and Result Analysis
- - Preparation of a Final Soils and Materials Investigations Report
|
8 |
Quality Control at CBL Kakungulu Reinforced Concrete Roads |
- - Concrete Mix Design
- - Material Testing
- - Field tests i.e. field density test by sand replacement
- - Carrying out laboratory tests on construction materials namely; PSD, Atterberg limits, Compaction CBR test, modification and testing
- - Data Entry and Result Analysis
- - Compressive Strength Tests
|
9 |
Geotechnical Investigations for Proposed Two (2) Storied Commercial Building, Kigo-Wakiso District |
- - Trial pits exploration to a depth of 1m, logging each trial pit, sampling and recording
- - Hand auguring
- - Conducting DCP tests near each excavated test pit
- - Carrying out laboratory tests namely; PSD, Hydrometer test, Atterberg limits, Compaction CBR test, Shear Test and Consolidation Tests
- - Data Entry and Result Analysis
- - Preparation of a Final Soils and Materials Investigations Report
|
10 |
Geotechnical Investigations and Material Testing for Mbarara Archidiocese Cathedral |
- - Trial pits exploration to a depth of 2m, logging each trial pit, sampling and recording
- - Hand auguring
- - Conducting DPL tests near each excavated test pit
- - Carrying out laboratory tests namely; PSD, Hydrometer test, Atterberg limits, Compaction CBR test, Shear Test and Consolidation Tests
- - Data Entry and Result Analysis
- - Preparation of a Final Soils and Materials Investigations Report
|
11 |
Structural Integrity Assessment Report for an Existing Mixed Development in Najjera |
- - Trial pits exploration to a depth of 2m outside and exposing the column pads, logging each trial pit
- - Concrete strength assessment using rebound Hammer
- - Conducting DCP tests near each excavated test pit
- - Reinforcement Identification in the structural Elements
- - Assessing the dimensions of the structural Elements
- - Carrying out laboratory tests namely; PSD, Hydrometer test, Atterberg limits, Compaction
- - Data Entry and Result Analysis
- - Preparation of a Final Soils and Materials Investigations Report
|
12 |
Geotechnical Investigations Report for Proposed Four Storied Residential Building at Plot 743, Block 183 Kyadondo |
- - Trial pits exploration to a depth of 2m, logging each trial pit, sampling and recording
- - Hand auguring
- - Conducting DCP tests near each excavated test pit
- - Carrying out laboratory tests namely; PSD, Hydrometer test, Atterberg limits, Sulphate content, chloride content, PH, Compaction, CBR test, Shear Test and Consolidation Tests
- - Data Entry and Result Analysis
- - Preparation of a Final Soils and Materials Investigations Report
|
13 |
Geotechnical Investigations Report for proposed Ian residential Project at Kyadondo |
- - Trial pits exploration to a depth of 2m, logging each trial pit, sampling and recording
- - Hand auguring
- - Conducting DCP tests near each excavated test pit
- - Carrying out laboratory tests namely; PSD, Hydrometer test, Atterberg limits, Sulphate content, chloride content, PH, Compaction, CBR test, Shear Test and Consolidation Tests
- - Data Entry and Result Analysis
- - Preparation of a Final Soils and Materials Investigations Report
|
14 |
Geotechnical investigations for the construction of 3 storeyed condominium apartments in Kisugu |
- - Trial pits exploration each to a depth of 4m, logging each trial pit, sampling and recording
- - Conducting DCP tests near each excavated test pit
- - Carrying out laboratory tests namely; PSD, Hydrometer test, Atterberg limits, Compaction CBR test, Dispersivity Tests, Shear Test etc
- - Data Entry and Result Analysis
- - Preparation of a Final Soils and Materials Investigations Report
|
15 |
Geotechnical Investigations Report for The Proposed Residential House at Kitikifumba, Bulindo |
- - Trial pits exploration to a depth of 2m, logging each trial pit, sampling and recording
- - Hand auguring
- - Conducting DCP tests near each excavated test pit
- - Carrying out laboratory tests namely; PSD, Hydrometer test, Atterberg limits, Sulphate content, chloride content, PH, Compaction, CBR test, Shear Test and Consolidation Tests
- - Data Entry and Result Analysis
- - Preparation of a Final Soils and Materials Investigations Report
|
16 |
Geotechnical Investigations Report for The Proposed Hotel at Nyakayojo, Mbarara |
- - Trial pits exploration to a depth of 2m, logging each trial pit, sampling and recording
- - Hand auguring
- - Conducting DCP tests near each excavated test pit
- - Carrying out laboratory tests namely; PSD, Hydrometer test, Atterberg limits, Sulphate content, chloride content, PH, Compaction, CBR test, Shear Test and Consolidation Tests
- - Data Entry and Result Analysis
- - Preparation of a Final Soils and Materials Investigations Report
|
17 |
Geotechnical investigations for a three storeyed residential apartments in Kitikifumba- Namugongo |
- - Trial pits exploration to a depth of 2m, logging each trial pit, sampling and recording
- - Conducting DCP tests near each excavated test pit
- - Carrying out laboratory tests namely; PSD, Hydrometer test, Atterberg limits, Compaction CBR test, Shear Tests
- - Data Entry and Result Analysis
- - Preparation of a Final Soils and Materials Investigations Report
|
18 |
Geotechnical investigations for the structural designs of a swimming pool in Lufumbe - Nakisunga subcounty, Mukono district |
- - Trial pits exploration to a depth of 2m, logging each trial pit, sampling and recording
- - Conducting DCP tests near each excavated test pit
- - Carrying out laboratory tests namely; PSD, Atterberg limits, Compaction CBR test
- - Data Entry and Result Analysis
- - Preparation of a Final Soils and Materials Investigations Report
|
19 |
Geotechnical investigations for a 3 storeyed dormitory building in Rwebikoona at St. Marys girls school |
- - Trial pits exploration to a depth of 2m, logging each trial pit, sampling and recording
- - Hand auguring
- - Conducting DCP tests near each excavated test pit
- - Carrying out laboratory tests namely; PSD, Hydrometer test, Atterberg limits, Compaction CBR test, Permeability, Shear Test and Consolidation Tests.
- - Data Entry and Result Analysis
- - Preparation of a Final Soils and Materials Investigations Report
|